St Cuthberts School Centennial Pool Complex

Project Overview

This project specified our PW1000 suite double glazed to manage the high humidity and potential for condensation to occur on the aluminium or glass surface. The Thermosash PW1000 suite performs exceptionally well with pool complexes due to its exceptional limited thermal transfer properties.

The project also includes 10 sliding stacking doors each 3500 H x 2500 W with a weight of approx 350kgs each - these slide easily opening one whole side of the building.

Also in our scope was the curtainwall to the entrances, channel glazed glass to the gymnasium, all commercial 40mm windows, mechanical ventilated doors and the ventilated air grilles to the perimeter windows (Sunblade Louvre Solutions).

Auckland

Architectus

Dominion

2014