Taranaki Base

Hospital - East Wing

Project Overview

The Taranaki Base Hospital redevelopment - Stage 2 includes the six storey, 20,000m2 East Wing Building (called NEWB) which houses Maternity, Neonatal, Radiology, ICU, the Emergency Department and other acute clinical services and has a rooftop helicopter pad. The project is estimated to be fully completed by the end of 2025.

The NEWB adjoins and is connected to the stage 1 Acute Services Building. The development is part of Project Maunga - a long-term plan to improve infrastructure at the original 1950s campus with a focus on more integrated and efficient patient care.

Project Certification

5 Green Star Design and As-Built NZ v1.0 certified Design Review from NZGBC

Total Clad Solution

Thermosash delivered a sustainable and seismically resilient Total Clad facade solution that improves energy efficiency and building health. Due to the modular nature of our systems, faster install timeframes are achieved enabling the rapid close-in of the building which assists follow-on trades. Thermosash DecarbALâ„¢ low embodied carbon aluminium elements contribute to NZ government 2050 targets.

Thermosash facade solutions include:

  • PW1000-TB200 Thermally Broken Unitised Curtainwall
  • Integrated Aluminium Plank Cladding with a variety of profiles
  • Flush glazed sashes
  • Double Bank Mechanical Louvres
  • Rooftop plant screen
  • Doors, glazed bi-parting doors
  • 5 x Skylights
  • Channel Glazing
  • Link bridge glazed facade

 

New Plymouth

Warren and Mahoney

Leighs Construction

2025

Relevant Projects

Taranaki Base Hospital

Taranaki Base Hospital

New Plymouth

Warren & Mahoney

Fletcher

2013